Signing off Design Intent Reports
When the layout designer considers the design intent to have fulfilled the original goal including any adjustments (captured within the design intent) they set the implementation status to complete
. In order to be considered fully implemented, the design intent must be reviewed and signed off by the schematic designer.
If you change the design intent in either Schematics XL or Layout XL after setting the implementation status to complete
, the status is automatically reset to none
.
-
Identify the design intent with a status of complete
in the Schematics XL Navigator. - Right-click a design intent or an object associated with the design intent and choose Design Intent – Edit Design Intent.
- Review the original design intent that was specified against any recorded notes and the actual outcome.
-
If the design intent is considered to have been satisfactorily implemented into the design, select the Signed Off option and click OK.
When design intent Design Intent Report is run, the Signed-off column displays a
icon against the design intent.
Related Topics
Return to top