Product Documentation
Simulation Driven Interactive Routing Task Assistant
Product Version IC23.1, June 2023

How do I connect twigs in interactive SDR?

In interactive SDR, you can identify the device pins (target pins identified by the flightlines) and automatically connect multiple pins with the appropriate wires and vias. The twig (wires from the device to the main wire) layer is automatically defined but can be changed. Also, the number of cuts in the vias and the width of the twigs are automatically adjusted.
The automatic twigs connection is independent of the current estimation mode and the checker modes.
To automatically connect twigs:

  1. Select a net in the Navigator assistant or EAD Browser.
  2. Select a source pin of the selected net in the layout design.
  3. Choose Create – Wiring – Wire.
  4. On SDR Toolbar, click the Automatically Connect Twigs button. The status of the button is modified to Automatically Connect Twigs: ON.
    When the mouse pointer moves close to an object on the same net, the twig connections are automatically created.
    By default, twigs are created on the layer above the layer on which the wire is created. However, you can change the twig layer at any time while creating the wire (See step 9).
  5. Press F3 to open the Create Wire form.
    By default, the Snap to Pin Center and Cover Pin options are deselected in the Create Wire form. In this case, the twigs are automatically created and snapped to the edge of the pin.
  6. Select the Snap to Pin Center option in the Create Wire form. This automatically connects the twigs to the center of the pin of the created wire segment.
  7. Select the Cover Pin option. This adjusts the twigs to automatically cover the source and target pins of the wire segment.
  8. (Optional) Press the { key to automatically connect the twigs to the top-left or bottom-right targets of the wire. By default, the twigs are automatically connected to all targets. The following figure shows the automatic twig connection to the bottom targets.
  9. Modify the twig layer by pressing the = key to move the twig layer up or the - key to move the twig layer down. When the twig layer is changed, the vias are automatically created on the wire being created.
  10. To finish connecting the twigs automatically, press Enter or click the last twig connection.

In addition, the Create Wire command identifies the Must Connect All Pins terminal instances and automatically makes twig connections for all the pins that must be connected.

Related Topics

How do I identify the net connections that either consume or generate the most current?

How do I perform a current density check in interactive SDR?

How do I perform resistance-driven interactive routing?

How do I optimize each segment using SDR?

Does simulation driven interactive routing supports over-device routing?

What tasks can I perform using the SDR toolbar?




 ⠀
X