Product Documentation
Voltus-XFi Custom Power Integrity Solution User Guide
Product Version IC23.1, November 2023

3


Setting Up and Running EM-IR Analysis

The steps for setting up and running EM-IR analysis in Voltus-XFi are detailed below.

  1. Specifying EM-IR Project Settings
  2. Specifying EM Rule Settings
  3. Specifying Power Nets for EM-IR Analysis
  4. Specifying Parasitic Extraction Settings
  5. Specifying Simulation Settings
  6. Running Post Layout Simulation
  7. Running EM-IR Analysis

Return to top
 ⠀
X